News & Media, Project Win
Published:
Share post on
  • linkedin
  • facebook
  • instagram

Project Complete: Goodman Gateway@Murarrie (Unit 1 & 2)

We are pleased to announce the completion of Unit 1 and Unit 2 at Goodman’s Gateway@Murarrie precinct in Queensland.

These two exceptional industrial facilities are built on a 28,654 sqm site adjacent to the M1 Gateway Motorway.

The Hindmarsh Industrial Team worked closely with key stakeholders to deliver a significant range of warehouse features for end-users, including:

  • Wide, oversized, and secure on-grade container hardstand suitable for B-doubles and forklifts
  • Multiple on-grade roller shutter doors with 15m wide cantilevered awning
  • Multiple recessed docks with load levellers and dispatch offices with amenities
  • Warehouse internal slabs rated for 7t racking point loads with 40 KPA UDL.

Representing an example of a leading, sustainable industrial estate, Gateway@Murarrie was constructed using several environmentally friendly initiatives and future-forward elements, including:

  • Low VOC paints and materials
  • Water efficient bathroom hardware
  • Native drought resistant landscaping
  • 500kW rooftop PV solar system across two buildings with LED lighting
  • Smart Metering & Rainwater harvesting tank capacity for irrigation
  • Eight Electric Vehicle Charging Points.

The project was delivered targeting a 5-Star Green Star Buildings rating and 20% upfront carbon emissions reduction.

Check out the full project profile here: Goodman Gateway@Murarrie, QLD – Hindmarsh

Goodman Gateway@Murarrie (Unit 1 & 2)
Goodman Gateway@Murarrie (Unit 1 & 2)
Goodman Gateway@Murarrie (Unit 1 & 2)
Goodman Gateway@Murarrie (Unit 1 & 2)
News & Media, Project Win
Published:
Share post on
  • linkedin
  • facebook
  • instagram
Goodman Gateway@Murarrie estate Queensland

Located at 17 Goodman Place the site comprises small to medium warehouse spaces, located adjacent to major arterial roads.

Hindmarsh will be delivering two new warehouses, including:

  • Structural steel portal framed warehouses – Unit 1 & Unit 2, 11,000 sqm of GFA with 28,654 sqm site
  • High clearance bays
  • 14 flush docks and 3 sunken docks with load levellers and dispatch offices with amenities
  • 15m wide cantilevered awning
  • Main office warehouse offices over two levels
  • Heavy duty hardstand
  • Battery charging
  • Light duty car parking
  • Separate (from truck access) carpark access.

Construction starts this month (Sept 2023) and is expected to reach completion in Mid 2024.

When asked about the project, Chadd Hume, Hindmarsh State Manager – Construction QLD said, “Hindmarsh  are excited to deliver this development  for Goodman’s a valued client We are committed to delivering a quality outcome and seamless service. This project will strengthen Hindmarsh’s presence in the Industrial space.”