Project Complete: Goodman Gateway@Murarrie (Unit 1 & 2)
We are pleased to announce the completion of Unit 1 and Unit 2 at Goodman’s Gateway@Murarrie precinct in Queensland.
These two exceptional industrial facilities are built on a 28,654 sqm site adjacent to the M1 Gateway Motorway.
The Hindmarsh Industrial Team worked closely with key stakeholders to deliver a significant range of warehouse features for end-users, including:
- Wide, oversized, and secure on-grade container hardstand suitable for B-doubles and forklifts
- Multiple on-grade roller shutter doors with 15m wide cantilevered awning
- Multiple recessed docks with load levellers and dispatch offices with amenities
- Warehouse internal slabs rated for 7t racking point loads with 40 KPA UDL.
Representing an example of a leading, sustainable industrial estate, Gateway@Murarrie was constructed using several environmentally friendly initiatives and future-forward elements, including:
- Low VOC paints and materials
- Water efficient bathroom hardware
- Native drought resistant landscaping
- 500kW rooftop PV solar system across two buildings with LED lighting
- Smart Metering & Rainwater harvesting tank capacity for irrigation
- Eight Electric Vehicle Charging Points.
The project was delivered targeting a 5-Star Green Star Buildings rating and 20% upfront carbon emissions reduction.
Check out the full project profile here: Goodman Gateway@Murarrie, QLD – Hindmarsh
We are delighted to announce that the Frasers National Tiles and PFG Australia project has been successfully completed.
Delivered within the Frasers Vantage Yatala estate this $34M+ project involved the design and construction of one warehouse facility, split into two tenancies.
The National Tiles distribution centre boasts a 16,632 sqm warehouse including 4,438 sqm awning, 1,473sqm of office space, and 118 car parking spaces.
The PFG Australia tenancy includes a 7,948 sqm warehouse including a 40m super awning, 818 sqm two-storey office, 2,384 sqm of all-weather operation hardstand, and 20 car parking spaces.
Chadd Hume, State Manager – Construction QLD said, “The Hindmarsh QLD team are proud of the final product. The project is testament to the hard work and dedication of the Hindmarsh Project Team, our Delivery Partners, and Suppliers – thank you to everyone involved.”
The new warehouse is designed to achieve a 5 Star Green Star rating, and boasts several sustainability initiatives, including:
- Rainwater capture and re-use
- Energy-efficient sensor lighting to office and warehouse areas
- Water-saving tapware (minimum 5 WELS rating)
- Energy and water metering and monitoring
- Native plants and drip irrigation.